(Created page with " the deckel kf2 takes regular oiling of the leadscrews via oil ports at the handwheels and of the way surfaces via a one-shot oiler. Way oil...")
 
Line 27: Line 27:
 
|}
 
|}
  
[[category:EquipmentMaintenance
+
[[category:EquipmentMaintenance]]

Revision as of 03:24, 7 July 2017

the deckel kf2 takes regular oiling of the leadscrews via oil ports at the handwheels and of the way surfaces via a one-shot oiler. Way oiling should be performed whenever the machine is used. leadscrew oiling should be performed monthly. The linkage joints should also be oiled on a monthly basis in order to ensure smooth operation. Otherwise the machine should be kept clean of chips. Clean up and way oiling should occur at each use, however, both should also be checked on a monthly basis to ensure the machine is in good repair even when not in use. While the tables should periodically be stoned flat, the owner (Tucker Tomlinson) asks that you have him perform this maintenance rather than doing it yourself. failure to lubricate the machine may result in binding and uneven cut pressure, resulting in snapped tool-bits. Inadequate lubrication will also result in excessive machine wear

Example maintenance log table

oil leadscrews oil linkage oil ways clean date completed person completing
monthly monthly monthly monthly