Anonymous

Changes

From Pumping Station One
563 bytes added ,  22:52, 2 October 2013
Line 15: Line 15:  
! Breaker # !! Used !! What Is It
 
! Breaker # !! Used !! What Is It
 
|-
 
|-
| 7,9,11 || yes. works. || Power to chiller/heat pump on the roof for AC.
+
| 7,9,11 || yes. works. || Power to chiller/heat pump on the roof for AC... and also the air handler under it inside. The
 
|-
 
|-
 
|}
 
|}
 +
 +
'''PB1-1'''
 +
 +
An unremarkable box full of wires.
 +
 +
'''PB1-2'''
 +
 +
Power box connected to PP1-1 by conduit. Bridges the A/C heat pump/air handler circuit, among other things. The 3-phase for A/c heat pump and air handler is bridged such that the entire 3 phase comes from PP1-1 up to the roof via PB1-2, and a branch switched on the roof by relay comes back down in the same conduit that goes the the roof. This circuit is passed via conduit to the air handler, and switched manually on the bottom of the air handler.
    
'''PP1-3'''
 
'''PP1-3'''
Cookies help us deliver our services. By using our services, you agree to our use of cookies.