Changes

Jump to navigation Jump to search
985 bytes added ,  00:08, 27 April 2017
Line 26: Line 26:  
|-
 
|-
 
| 22 || unused || this is a stray 208v single red wire on a 3 phase breaker that runs to wiring troughin the boiler room. Should be disconnected and abandoned.(used to be paired with wires pp1-2 # 35&37)
 
| 22 || unused || this is a stray 208v single red wire on a 3 phase breaker that runs to wiring troughin the boiler room. Should be disconnected and abandoned.(used to be paired with wires pp1-2 # 35&37)
 +
|-
 +
|}
 +
 +
<br />
 +
 +
The following is the result of wire tracing done 04/25/2017. Tucker
 +
<br />
 +
Conduits from this panel were sharpie labeled with letters for this mapping.
 +
{|Class="wikitable sortable" border="1" style="td { border: 1px solid #000000}"
 +
|-
 +
! Conduit Label !! feed path !! What It Feeds
 +
|-
 +
| A || direct run across ceiling to junction in catwalk, from junction along catwalk and down to PP1-5 || PP1-5
 +
|-
 +
| B || Via PB1-2 to roof || AC
 +
|-
 +
| C || To junction above SE corner of boiler room, then to socket on boiler room wall || Socket PP1-1:10 on small metals wall near S end of wall
 +
|-
 +
| D || direct run to boiler room || main boiler room feed
 +
|-
 +
| E || across shop celing to catwalk || Feeds through wall to upstairs rooms
 +
|-
 +
| F || across shop roof to junction ~7ft from old laser exhaust, leg towards east wall dead ends, leg S drops to kitchen wall, runs into new lounge, takes 90deg through lounge wall and into safe||PP6
 +
|-
 +
| G || Direct to boiler room || compressor
 
|-
 
|-
 
|}
 
|}
Domain Admins
296

edits

Cookies help us deliver our services. By using our services, you agree to our use of cookies.

Navigation menu