Changes

Jump to navigation Jump to search
251 bytes added ,  12:47, 20 April 2020
→‎First Floor: Added results of breaker tracing
Line 7: Line 7:  
====PP1-1====
 
====PP1-1====
   −
Back of the shop by the loading dock. Can't miss it.
+
Back of the shop by the loading dock. Can't miss it. Served from main switch by back door (probably from the upper disconnect, but haven't verified).
    
Single phase and 2 pole circuits wired to 3 phase breakers.
 
Single phase and 2 pole circuits wired to 3 phase breakers.
Line 18: Line 18:  
|-
 
|-
 
! Breaker # !! Used !! What Is It
 
! Breaker # !! Used !! What Is It
 +
|-
 +
|-
 +
| "Main" || used || 400 amp 2-pole. Not actually the main breaker but it looks like one. Feeder to PP1-2.
 
|-
 
|-
 
| 8&10&12 || unused || 3 phase, 20 amp, 3 black. Wiring trough, boiler room.  Dust collection circuit thru existing disconnect.
 
| 8&10&12 || unused || 3 phase, 20 amp, 3 black. Wiring trough, boiler room.  Dust collection circuit thru existing disconnect.
Line 54: Line 57:  
====PP1-2====
 
====PP1-2====
   −
Back of the shop by the loading dock. Can't miss it.
+
Back of the shop by the loading dock. Can't miss it. Fed from big breaker at the top of PP1-1.
    
{|Class="wikitable sortable" border="1" style="td { border: 1px solid #000000}"
 
{|Class="wikitable sortable" border="1" style="td { border: 1px solid #000000}"
49

edits

Cookies help us deliver our services. By using our services, you agree to our use of cookies.

Navigation menu