Ball ways and table are installed. Test grinds are showing good repeatability. A grit and light parts catcher is installed on the left hand side.
 
Ball ways and table are installed. Test grinds are showing good repeatability. A grit and light parts catcher is installed on the left hand side.
   −
# Remove saddle, clean ways and check turcite for damage.
+
# Remove saddle
# Remove the grinder from the pallet and align parallel to the long wall. Set up the materials storage and maybe plywood on the right side.
+
## Clean ways and check turcite for damage.
# Install a full wheel guard.
+
## Replace way wipers.
 +
## Fix y-axis oil lines.
 
# Clean Z ways.
 
# Clean Z ways.
 
# Replace Z way pleated covers.
 
# Replace Z way pleated covers.
# Fill lubrication tank with correct oil. Check that all oil lines are working.
+
# Mount/grind in a chuck.
 
# Develop an authorization plan.
 
# Develop an authorization plan.
 +
# Set up dust collection.
    