Difference between revisions of "Moving and budget authorization"
Jump to navigation
Jump to search
m (Robot: Cosmetic changes) |
|||
(One intermediate revision by one other user not shown) | |||
Line 1: | Line 1: | ||
− | + | This motion is scheduled to vote on February 21, 2012 | |
− | ===Sponsor=== | + | === Sponsor === |
Tim Saylor | Tim Saylor | ||
− | ===Introduced=== | + | === Introduced === |
February 14, 2012 | February 14, 2012 | ||
− | ===Language=== | + | === Language === |
The board is hereby authorized to negotiate for and sign a lease for the space at 3519 N. Elston, and to spend any money necessary to move and to maintain operation of the hackerspace as continuously as possible during the move, including but not limited to: | The board is hereby authorized to negotiate for and sign a lease for the space at 3519 N. Elston, and to spend any money necessary to move and to maintain operation of the hackerspace as continuously as possible during the move, including but not limited to: | ||
Line 21: | Line 21: | ||
** Paint | ** Paint | ||
− | ===Vote=== | + | === Vote === |
Yea: | Yea: | ||
Nay: | Nay: | ||
Present: | Present: | ||
− | + | [[Category:Votes]] | |
− | [[Category: | + | [[Category:Finance]] |
+ | [[Category:Budget]] | ||
+ | [[Category:Voting Information Missing]] |
Latest revision as of 00:25, 18 March 2014
This motion is scheduled to vote on February 21, 2012
Sponsor
Tim Saylor
Introduced
February 14, 2012
Language
The board is hereby authorized to negotiate for and sign a lease for the space at 3519 N. Elston, and to spend any money necessary to move and to maintain operation of the hackerspace as continuously as possible during the move, including but not limited to:
- Moving supplies
- Moving trucks
- Hand trucks
- Boxes
- Pizza & beverage bribes for labor
- Build out supplies
- Tables
- Shelves
- Paint
Vote
Yea: Nay: Present: