Difference between revisions of "Vote to buy a new UPS"

From Pumping Station One
Jump to navigation Jump to search
Line 17: Line 17:
 
Turning on a 3rd hypervisor triggers the overloaded alarm on the existing UPS.
 
Turning on a 3rd hypervisor triggers the overloaded alarm on the existing UPS.
  
 +
=== Current Utilization ===
  
 +
Anthony Measured the power consumption of existing rack infrastructure.
  
 
{| class="wikitable"
 
{| class="wikitable"
Line 51: Line 53:
 
|20W
 
|20W
 
|}
 
|}
 
 
 
  
 
== Language ==
 
== Language ==

Revision as of 23:50, 7 September 2014

This may not come to a vote, It may be purchased under a "maintaining infrastructure" clause in the budget/bylaws.

That said, it is a lot of relatively expensive equipment being discussed.

Sponsors

History

Background

Our UPS is failing.

On Current Load, we can only run 2 out of 4 hypervisors running. The 2 that are on are nearing capacity.

Turning on a 3rd hypervisor triggers the overloaded alarm on the existing UPS.

Current Utilization

Anthony Measured the power consumption of existing rack infrastructure.

Rack Hardware Power Usage
Device Wattage
KVM 10W
Motorola SURFboard 20W
Dell Power Edge 331 W, (Rated for 670 Watts)
Dell Power Edge 331 W, (Rated for 670 Watts)
Dell Power Edge 331 W, (Rated for 670 Watts)
Dell Power Edge 331 W, (Rated for 670 Watts)
SAN 427W
HP Procurve 340W
Serial Console 20W

Language