PC Hardware Vote 2014
Jump to navigation
Jump to search
Sponsor
History
- Announced: 2014-04-29
- Language lockdown: 2014-05-06
- Vote date: 2014-05-13 - Passed
- 23 yes, 3 no, 5 present
Background
Some new computer hardware would be nice.
Purchased hardware should have the following traits:
- Large Display: Important for design work
- Responsive: Interuptions are very costly to creative processes, and frustrate users
- longevity: All machines would be expected to be highly useful for 4 years.
- Uniform: Nearly Identical hardware is desireable
- Warrantied: It's a Hackerspace, the probably of a thing breaking is multiplied by the size of the membership using it.
Baseline Expectations
- 8GB Ram
- Quad core CPU, 3.2 GHz
- Windows 8.1 Pro, or OS X 10.9
- 7200RPM drive or SSD
- All standard cd/dvd reading, writing capabilities
- Geforce 600 Series or better graphics
Hardware
link | price | CPU | Ram | HDD | warranty |
---|---|---|---|---|---|
Lenovo ThinkCentre M83 10AL | $943.99 | Core i7 4770 3.4Ghz | 8GB | 1TB | 4 year $55.99 |
ViewSonic VA2246m-LED - LED monitor - 22" | $129.99 | 4 year $13.99 | |||
Logitech B100 Optical USB Mouse | $7.49 | ||||
Microsoft Wired Keyboard 600 | $14.99 |
Computer Locations
Area | Location | Computer | Total Price |
---|---|---|---|
Arts | Vinyl Cutter PC replacement | Lenovo ThinkCentre M83 10AL | $1,260.44 |
CNC | Epilog Laser Engraver Replacement | Lenovo ThinkCentre M83 10AL | $1,260.44 |
CNC | LulzBot PC Replacement | Lenovo ThinkCentre M83 10AL | $1,260.44 |
CNC | Shapoko/Aspire machine | Lenovo ThinkCentre M83 10AL | $1,260.44 |
Electronics | General Access Machine (CAD) | Lenovo ThinkCentre M83 10AL | $1,260.44 |
Woodshop | Shopbot PC | Lenovo ThinkCentre M83 10AL | $1,260.44 |
Additional costs
- CDW shipping: $128.75 (might be less after dropping pc's)
Total
- Actual Total: $7,691.39
- +10% buffer: $8,460.53
Language
Authorize the board to spend up to $8,460.53 of Spaces funds on PC hardware, including peripherals, related accessories, shipping, et cetera. Authorization expires 90 days after the vote is accepted. The expenditure is to be executed so long as there are more than 8 months worth of rent in savings.