Line 11: |
Line 11: |
| |value=~$3000}} | | |value=~$3000}} |
| | | |
− | == Repair == | + | == Repair and Setup== |
| All repair needs to be coordinated with the area host. | | All repair needs to be coordinated with the area host. |
| | | |
| Motor bearings were replaced, to great success. | | Motor bearings were replaced, to great success. |
− | Ball ways and table are installed. The test grind on 4140PH at 23 Hz. went well. Good finish with no ripples. | + | Ball ways and table are installed. Test grinds are showing good repeatability. A grit and light parts catcher is installed on the left hand side. |
| | | |
| # Remove saddle, clean ways and check turcite for damage. | | # Remove saddle, clean ways and check turcite for damage. |
Line 21: |
Line 21: |
| # Replace Z way pleated covers. | | # Replace Z way pleated covers. |
| # Fill lubrication tank with correct oil. Check that all oil lines are working. | | # Fill lubrication tank with correct oil. Check that all oil lines are working. |
| + | # Remove the grinder from the pallet and align parallel to the long wall. Set up the materials storage and maybe plywood on the right side. |
| + | # Install a full wheel guard. |
| + | # Develop an authorization plan. |
| | | |
| == Diagnosis == | | == Diagnosis == |
| After initial repair, diagnosis of further issues will come via a test grind. | | After initial repair, diagnosis of further issues will come via a test grind. |
| | | |
− | # The table will need to be ground in. | + | # The table may need to be ground in. |
− | # A mag chuck will need to be ground in. | + | # A mag chuck will need to be ground in and swept with an indicator. |
− | # Five block test can be used as a quick diagnosis. | + | # Five block test can be used as a rough diagnosis. |
| | | |
| == Table Removal == | | == Table Removal == |