Changes

Jump to navigation Jump to search
10 bytes added ,  07:31, 1 December 2022
Line 22: Line 22:  
(e.g. roof leak, SEVERE plumbing/electrical problems, door won’t lock, etc., fire, injury requiring hospitalization, et cetera.)
 
(e.g. roof leak, SEVERE plumbing/electrical problems, door won’t lock, etc., fire, injury requiring hospitalization, et cetera.)
   −
The PS:1 Board (President):
+
The PS:1 Board:
    
Vulture:
 
Vulture:
Line 32: Line 32:  
(e.g. doors difficult to close, dripping faucets, clogged toilets, internet outages, broken tools/machines et cetera.)
 
(e.g. doors difficult to close, dripping faucets, clogged toilets, internet outages, broken tools/machines et cetera.)
 
Post to Discourse: <br />
 
Post to Discourse: <br />
[https://discourse.pumpingstationone.org discourse.pumpingstationone.org]   
+
[https://discourse.pumpingstationone.org Discourse]   
    
Email Board of Directors and open a ticket: <br />
 
Email Board of Directors and open a ticket: <br />
Line 38: Line 38:     
== Broken tools ==
 
== Broken tools ==
Tag it as broken, post to Discourse, notify area host or [mailto://[email protected] [email protected]] if you are unsure who the area host is or how to contact them.
+
Tag it as broken, post to [https://discourse.pumpingstationone.org Discourse, notify area host or [mailto://[email protected] [email protected]] if you are unsure who the area host is or how to contact them.
Cookies help us deliver our services. By using our services, you agree to our use of cookies.

Navigation menu