These are the steps involved for this vote:
 
These are the steps involved for this vote:
   −
- Installation of electrical and eventually water connections (even if water can still be a removable pipe like it is actually)
+
* Installation of electrical and eventually water connections (even if water can still be a removable pipe like it is actually)
- Moving of the coffee roaster under the exhaust
+
* Moving of the coffee roaster under the exhaust
- Connection of the roaster to the exhaust. There is no special safety precautions, the connection should be done according to the Java Master instructions where the hot air is allowed so suck in some of the room air (so no direct connection). Temperature at that level is around 150F so is safe to exhaust on the roof.
+
* Connection of the roaster to the exhaust. There is no special safety precautions, the connection should be done according to the Java Master instructions where the hot air is allowed so suck in some of the room air (so no direct connection). Temperature at that level is around 150F so is safe to exhaust on the roof.