Difference between revisions of "Board Meeting Notes 2009-07-14"
Jump to navigation
Jump to search
Knitmeapony (talk | contribs) |
m (Robot: Cosmetic changes) |
||
Line 1: | Line 1: | ||
− | |||
{{Board Meeting Notes | Previous MM-DD-YYYY=07-07-2009 | Current YY-MM-DD=07-014-2009 | Next MM-DD-YYYY=07-21-2009 | YYYY=2009}} | {{Board Meeting Notes | Previous MM-DD-YYYY=07-07-2009 | Current YY-MM-DD=07-014-2009 | Next MM-DD-YYYY=07-21-2009 | YYYY=2009}} | ||
− | ===Attendance=== | + | === Attendance === |
* Jordan | * Jordan | ||
Line 17: | Line 16: | ||
* Paul | * Paul | ||
− | ===Come to Order - 7:35=== | + | === Come to Order - 7:35 === |
* "Grand Opening" - Julie | * "Grand Opening" - Julie | ||
Line 40: | Line 39: | ||
* Members only locksport study group | * Members only locksport study group | ||
− | ===Meeting Adjourned - 7:56=== | + | === Meeting Adjourned - 7:56 === |
+ | |||
+ | [[Category:Board Meetings]] |
Revision as of 14:31, 17 March 2014
Board Meeting Minutes | ||
---|---|---|
<< [[Board Meeting Notes {{{Previous YYYY-MM-DD}}}]] | 2009 Board Meetings | [[Board Meeting Notes {{{Next YYYY-MM-DD}}}]] >> |
Attendance
- Jordan
- Zane
- Eric
- Ishmael
- Jeff
- Nicky
- Sacha
- Nathan
- Chris
- Freddy
- Julie
- Paul
Come to Order - 7:35
- "Grand Opening" - Julie
- Introduction of the actual space was not done, want to do it up right.
- Inviting possible donors/sponsors is a good idea
- Plan to have held shortly after PPPWRS is over.
- Emphasis on showcasing finished projects.
- Make use of project board, commit to completion
- Push to get more green tech started.
- Mounting solar collector onto the roof that will provide natural light to the space.
- Building an automated bamboo culture that grows 6-8" per week.
- Down the road: water reclaimation
- Could possibly close in on LEED certification
- Mounting solar collector onto the roof that will provide natural light to the space.
- Not aiming to rush projects
- Organize talks
- Analog File System - Nathan
- Get your files together and bring in to permanently archive.
- War Zone - Eric
- Will have equipment donated from Astaro.
- Lining up press release with CCCKC for launch currently.
- Will have equipment donated from Astaro.
- 45 Members, on track to making buffer rent
- Members only locksport study group