Difference between revisions of "Talk:Kitchen host budget and ceiling build out costs"

From Pumping Station One
Jump to navigation Jump to search
(Created page with "Who is expected to do the actual purchasing? --~~~~")
 
Line 1: Line 1:
 
Who is expected to do the actual purchasing?
 
Who is expected to do the actual purchasing?
 
--[[User:Hef|Hef]] ([[User talk:Hef|talk]]) 22:03, 30 August 2013 (CDT)
 
--[[User:Hef|Hef]] ([[User talk:Hef|talk]]) 22:03, 30 August 2013 (CDT)
 +
 +
 +
* Wasn't there some legal problems with creating a ceiling?
 +
* The area host should be notified BEFORE the purchase to prevent two purchases at once.
 +
* The language "electrical for beer church" is a bit vague.  I think this should specifically state what is being built.
 +
* Does the spending authority for the entire motion expire after 60 days or just ceiling and lighting?  I found this a little unclear.
 +
-- eviljoel

Revision as of 01:31, 4 September 2013

Who is expected to do the actual purchasing? --Hef (talk) 22:03, 30 August 2013 (CDT)


  • Wasn't there some legal problems with creating a ceiling?
  • The area host should be notified BEFORE the purchase to prevent two purchases at once.
  • The language "electrical for beer church" is a bit vague. I think this should specifically state what is being built.
  • Does the spending authority for the entire motion expire after 60 days or just ceiling and lighting? I found this a little unclear.

-- eviljoel