Difference between revisions of "Talk:Kitchen host budget and ceiling build out costs"
Jump to navigation
Jump to search
m |
|||
Line 1: | Line 1: | ||
Who is expected to do the actual purchasing? | Who is expected to do the actual purchasing? | ||
--[[User:Hef|Hef]] ([[User talk:Hef|talk]]) 22:03, 30 August 2013 (CDT) | --[[User:Hef|Hef]] ([[User talk:Hef|talk]]) 22:03, 30 August 2013 (CDT) | ||
− | |||
* Wasn't there some legal problems with creating a ceiling? | * Wasn't there some legal problems with creating a ceiling? |
Revision as of 01:31, 4 September 2013
Who is expected to do the actual purchasing? --Hef (talk) 22:03, 30 August 2013 (CDT)
- Wasn't there some legal problems with creating a ceiling?
- The area host should be notified BEFORE the purchase to prevent two purchases at once.
- The language "electrical for beer church" is a bit vague. I think this should specifically state what is being built.
- Does the spending authority for the entire motion expire after 60 days or just ceiling and lighting? I found this a little unclear.
-- eviljoel