Talk:Kitchen host budget and ceiling build out costs

From Pumping Station One
Revision as of 01:31, 4 September 2013 by Eviljoel (talk | contribs)
Jump to navigation Jump to search

Who is expected to do the actual purchasing? --Hef (talk) 22:03, 30 August 2013 (CDT)

  • Wasn't there some legal problems with creating a ceiling?
  • The area host should be notified BEFORE the purchase to prevent two purchases at once.
  • The language "electrical for beer church" is a bit vague. I think this should specifically state what is being built.
  • Does the spending authority for the entire motion expire after 60 days or just ceiling and lighting? I found this a little unclear.

-- eviljoel